fenner-valley
Menu
  • About Us
  • Meetings
  • Cadiz Water Project
  • Resources
    • FY 2024 FVWA Annual Financial Report
    • FY 2023 FVWA Annual Financial Report
    • FY 2022 FVWA Annual Financial Report
    • Studies
    • Final EIR
    • Final EIR Addendum
    • Groundwater Management,
      Monitoring, and Mitigation Plan (Pdf file 4016KB)
    • Joint Powers Authority Agreement (Pdf file 1623KB)
    • Aquilogic Report Cadiz Project Overview 2-19
  • Contact Us

Final EIR

Volume 1

0. Executive Summary (PDF)

1. Introduction (PDF)

2. Project Background (PDF)

3. Project Description (PDF)

4. Environmental Setting, Impacts, and Mitigation Measures (PDF)

4.1 Aesthetics (PDF)

4.2 Agriculture and Forestry Resources (PDF)

4.3 Air Quality (PDF)

4.4 Biological Resources (PDF)

4.5 Cultural Resources (PDF)

4.6 Geology and Soils (PDF)

4.7 Greenhouse Gas Emissions (PDF)

4.8 Hazards and Hazardous Materials (PDF)

4.9 Hydrology and Water Quality (PDF)

4.10 Land Use and Planning (PDF)

4.11 Mineral Resources (PDF)

4.12 Noise (PDF)

4.13 Public Services and Utilities (PDF)

4.14 Recreation (PDF)

4.15 Transportation and Traffic (PDF)

5. Cumulative Impacts (PDF)

6. Growth-Inducement Potential and Secondary Effects of Growth (PDF)

7. Alternatives Analysis (PDF)

8. Irreversible and Irretrievable Commitment of Resources (PDF)

9. Report Preparers (PDF)

10. Acronyms (PDF)

11. References (PDF)

Volume 2

Appendix A Scoping Report (PDF)

Appendix B1 Groundwater Management, Monitoring, and Mitigation Plan (PDF)

Appendix B2 Groundwater Stewardship Committee October 2011 Summary of Findings and Recommendation

Appendix C Pipeline Alignment Map Book (PDF)

Appendix D Power Requirements Analysis (PDF)

Volume 3

Appendix E1 URBEMIS 2007 – Output Sheets (PDF)

Appendix E2 Fugitive Dust and Effects from Changing Water Table at Bristol and Cadiz Playas (PDF)

Appendix E3 Emissions Worksheets (PDF)

Appendix F1 Focused Survey for Desert Tortoise, Habitat Evaluation for Burrowing Owl, and General B

Appendix F2 Streambed Delineation (PDF)

Appendix F3 Rare Plant Survey Report (PDF)

Appendix F4 Vegetation, Groundwater – Levels and Potential Impacts from Groundwater Pumping near Br

Appendix G1 Phase I Cultural Resources Assessment (PDF)

Appendix G2 Paleontology Survey and Assessment (PDF)

Volume 4

Appendix H1A Cadiz Groundwater Modeling and Impact Analysis – Volume 1 (PDF)

Appendix H1B Cadiz Groundwater Modeling and Impact Analysis – Volume 2 (PDF)

Appendix H1C Cadiz Groundwater Modeling and Impact Analysis – Volume 3 (PDF)

Appendix H2 Supplemental Assessment of Pumping Required (PDF)

Appendix H3 Assessment of Effects of the Cadiz Groundwater Conservation Recovery and Storage Projec

Appendix H4 Springs Fieldwork (PDF)

Appendix H5 Addendum to September 1, 2011 – Cadiz Groundwater Modeling and Impact Analysis (PDF)

Appendix I Economic Impact Report (PDF)

Appendix J Significant and Unavoidable Impacts Identified in General Plan EIRs for Counties and Cit

Notice of Public Hearing (PDF)

Volume 5

V5 0 Table of Contents (PDF)

V5 1 Introduction (PDF)

V5 2-1 Comment Letters – Overview (PDF)

V5 2-2-1 Comment Letters – Federal Agencies (PDF)

V5 2-2-2 Comment Letters – Native American Tribes (PDF)

V5 2-2-3 Comment Letters – State Agencies (PDF)

V5 2-2-4 Comment Letters – Local Agencies (PDF)

V5 2-3 Comment Letters – Organizations (PDF)

V5 2-4 Comment Letters – Individuals (PDF)

V5 2-5 Comment Letters – Form Letter (PDF)

V5 2-6-1 Public Hearing – Rancho Sta Margarita (PDF)

V5 2-6-2 Public Hearing – Joshua Tree (PDF)

V5 2-7 Comment Letters – Received after Close (PDF)

Volume 6

V6 0 Table of Contents (PDF)

V6 3-0 Master Responses – Overview (PDF)

V6 3-01 MR – Groundwater Recharge and Evap (PDF)

V6 3-02 MR – Groundwater Modeling (PDF)

V6 3-03 MR – Groundwater Pumping Imps (PDF)

V6 3-04 MR – Springs (PDF)

V6 3-05 MR – Dry Lake Dust (PDF)

V6 3-06 MR – Veg Effects on Drawdown (PDF)

V6 3-07 MR – Water Rights Law (PDF)

V6 3-08 MR – GMMMP (PDF)

V6 3-09 MR – Biological Resources (PDF)

V6 3-10 MR – SMWD as Lead Agency (PDF)

V6 3-11 MR – CEQA Public Process (PDF)

V6 3-12 MR – Project vs Program Analysis (PDF)

V6 3-13 MR – Railroad ROW and NEPA (PDF)

V6 3-14 MR – Alternatives (PDF)

V6 3-15 MR – Termionology (PDF)

V6 4 Response to Comments (PDF)

V6 5 Draft EIR Text Revisions (PDF)

V6 6 Additional References (PDF)

   Volume 7

V7 0 Table of Contents (PDF)

V7 0 Volume 7 Intro (PDF)

V7 Appx B1 UPDATED – GMMMP (PDF)

V7 Appx E2 UPDATED – Fugitive Dust (PDF)

V7 Appx E3 UPDATED – Emissions Worksheets (PDF)

V7 Appx F3 UPDATED – Rare Plant Survey (PDF)

V7 Appx F4 UPDATED – Grndwtr Pump Imps (PDF)

V7 Appx H3 UPDATED – Effects on Springs (PDF)

V7 Appx K1 NEW – DEIR Notifications (PDF)

V7 Appx K2 NEW – NOE Notifications (PDF)

V7 Appx L1 NEW – Evap Estimates (PDF)

V7 Appx L2 NEW – Evap Discharge (PDF)

V7 Appx M1 NEW – Opinion M-37025 (PDF)

V7 Appx M2 NEW – Railroad ROW Uses (PDF)

V7 Appx M3 NEW – ARZC Lease (PDF)

V7 Appx N NEW – MOU (PDF)

V7 Appx O NEW – Cultural Resources Survey (PDF)

Member Agencies

logo
logo

© Fenner Valley Water Authority. All rights reserved.

In care of Santa Margarita Water District | 26111 Antonio Parkway | Rancho Santa Margarita, CA 92688 | 949. 459.6400